AIXBOILERPRESSURE VESSELS & BOILERS Enquiry

LDR / WDR Electric Steam Boiler – 0.1 to 4 t/h, Plug-and-Play

LDR / WDR Electric Steam Boiler – 0.1 to 4 t/h, Plug-and-Play

Electric steam boilers are chosen for three reasons: no flue route, no fuel handling, and a load that is small or intermittent. The LDR (vertical) and WDR (horizontal) cover 0.1–4 t/h with resistance elements immersed…

  • Built to your capacity, pressure and material requirements
  • Inspection records and export documentation
  • Spare parts and commissioning guidance
CapacityTo be confirmed against duty
MaterialCarbon steel / SS304 / SS316L / glass-lined
Design pressure0.6–2.5 MPa (as required)
ApplicationIndustrial process

Specifications can be customised. Contact us for full technical data and drawings.

  • Food and beverage industry
  • Palm oil mills and biomass processing
  • Textile, rubber and plastics
  • Chemical, pharmaceutical and paper

Electric resistance steam boilers from 72 kW to 3 MW (0.1–4 t/h), 0.7–1.6 MPa, no flue or fuel store, PLC controlled and skid-mounted.

Category:

Description

Electric steam boilers are chosen for three reasons: no flue route, no fuel handling, and a load that is small or intermittent. The LDR (vertical) and WDR (horizontal) cover 0.1–4 t/h with resistance elements immersed in the water space.

Construction

  • Pressure vessel in Q245R or 304/316L, with a large steam space for dry steam.
  • Flanged element bundles, replaceable without cutting the shell.
  • Staged contactors or SCR for smooth pressure control.
  • Feedwater pump, level controls, safety valve and blowdown valve on the skid.

Technical specification

Parameter Range
Steam capacity 0.1 – 4 t/h (72 kW – 3 MW)
Design pressure 0.7 – 1.6 MPa
Steam temperature 170 – 204 °C saturated
Efficiency 99 %
Voltage 380 / 400 / 415 / 440 V, 50 or 60 Hz
Control PLC, pressure PID, BMS / Modbus

Where it makes sense

Hospitals and laboratories needing sterile steam, food plants with small batch duties, pilot lines, and plants in city centres where a stack is not permitted. It is also used as a standby boiler alongside a fuel-fired unit.

Operating cost and water quality

Electricity per tonne of steam is roughly 700–750 kWh at 99 % efficiency; the tariff decides the economics. Water quality matters more than on a fuel boiler because scale on elements causes local overheating, so a softener and regular blowdown are mandatory.

FAQ

Can it be installed in a basement? Yes — no flue and no combustion air are needed, only electrical capacity and a drain.

What is the start-up time? Typically 10–20 minutes from cold, much faster than a fire-tube boiler.

Compared with other options

Typical differences between AIXBOILER equipment and a general-market alternative.

AIXBOILERGeneral market
Manufacturing & inspectionSelected Grade-A partner factories in China, third-party inspectionUnverified sourcing / outsourced production
Efficiency on siteOptimised combustion, low excess air, tested at commissioningNameplate figure only
DocumentationDrawings, material certificates, O&M manualLimited or on request
After-salesSpare parts and engineer support, remote diagnosisVaries, often no local stock
CustomisationFuel, pressure, voltage and layout adaptedFixed catalogue models

Questions

Can the capacity be customised?

Yes. Capacity, pressure and fuel are matched to your process requirements.

What is the delivery time?

Typically 30-60 working days after drawing approval.

Is installation included?

We provide installation supervision, commissioning and operator training.

Request a Quotation

Send the duty and site conditions; our technical team will reply with a specification and price.

We reply within one working day. Your data is used only to answer this enquiry.

WA Chat on WhatsApp
WAWhatsApp ✉Email Enquiry