AIXBOILERPRESSURE VESSELS & BOILERS Enquiry

WNS Gas and Oil Steam Boiler – 0.5 to 20 t/h, Low NOx, Skid-Mounted

WNS Gas and Oil Steam Boiler – 0.5 to 20 t/h, Low NOx, Skid-Mounted

The WNS is the workhorse of packaged steam: a three-pass wet-back fire-tube boiler that arrives on a skid with burner, controls and feedwater equipment, and is producing steam within days of landing. The design has not…

  • Built to your capacity, pressure and material requirements
  • Inspection records and export documentation
  • Spare parts and commissioning guidance
CapacityTo be confirmed against duty
MaterialCarbon steel / SS304 / SS316L / glass-lined
Design pressure0.6–2.5 MPa (as required)
ApplicationIndustrial process

Specifications can be customised. Contact us for full technical data and drawings.

  • Food and beverage industry
  • Palm oil mills and biomass processing
  • Textile, rubber and plastics
  • Chemical, pharmaceutical and paper

Three-pass wet-back fire-tube steam boiler for gas and oil, 0.5–20 t/h, 1.0–2.5 MPa, ≥96 % efficiency and NOx from 30 mg/m³.

Category:

Description

The WNS is the workhorse of packaged steam: a three-pass wet-back fire-tube boiler that arrives on a skid with burner, controls and feedwater equipment, and is producing steam within days of landing. The design has not changed much in thirty years because it works — what has changed is the efficiency and the emission limit it has to meet.

Why wet-back

In a wet-back boiler the reversal chamber is surrounded by water rather than refractory. That removes the most common maintenance item on dry-back units — cracked rear refractory — and it cools the tube plate more evenly, which extends the life of the tube-to-plate welds.

Technical specification

Parameter Range
Steam capacity 0.5 – 20 t/h
Design pressure 1.0, 1.25, 1.6, 2.5 MPa
Saturated steam temperature 184 – 226 °C
Efficiency ≥ 96 % with economiser (gas)
NOx ≤ 30 – 80 mg/m³ depending on burner
Fuel Natural gas, LPG, diesel, heavy oil, dual fuel
Turndown 5:1

Package scope

Pressure vessel, burner, feedwater pump set, water level controls, safety valves, pressure switch, control panel and economiser. Optional: deaerator, softener, blowdown heat recovery, and a skid-mounted steam header.

Efficiency in practice

The economiser recovers about 5–6 points; the rest depends on excess air and blowdown. Running at 3 % O₂ instead of 6 % is worth roughly one point of efficiency, and a 10 % blowdown rate on a 10 t/h boiler wastes more fuel than most operators realise.

FAQ

How long does installation take? Typically 5–10 days including steam piping connection and commissioning.

Can it meet 30 mg/m³ NOx? Yes, with a low-NOx burner and flue gas recirculation where the furnace volume allows.

Compared with other options

Typical differences between AIXBOILER equipment and a general-market alternative.

AIXBOILERGeneral market
Manufacturing & inspectionSelected Grade-A partner factories in China, third-party inspectionUnverified sourcing / outsourced production
Efficiency on siteOptimised combustion, low excess air, tested at commissioningNameplate figure only
DocumentationDrawings, material certificates, O&M manualLimited or on request
After-salesSpare parts and engineer support, remote diagnosisVaries, often no local stock
CustomisationFuel, pressure, voltage and layout adaptedFixed catalogue models

Questions

Can the capacity be customised?

Yes. Capacity, pressure and fuel are matched to your process requirements.

What is the delivery time?

Typically 30-60 working days after drawing approval.

Is installation included?

We provide installation supervision, commissioning and operator training.

Request a Quotation

Send the duty and site conditions; our technical team will reply with a specification and price.

We reply within one working day. Your data is used only to answer this enquiry.

WA Chat on WhatsApp