Description
The WNS is the workhorse of packaged steam: a three-pass wet-back fire-tube boiler that arrives on a skid with burner, controls and feedwater equipment, and is producing steam within days of landing. The design has not changed much in thirty years because it works — what has changed is the efficiency and the emission limit it has to meet.
Why wet-back
In a wet-back boiler the reversal chamber is surrounded by water rather than refractory. That removes the most common maintenance item on dry-back units — cracked rear refractory — and it cools the tube plate more evenly, which extends the life of the tube-to-plate welds.
Technical specification
| Parameter | Range |
|---|---|
| Steam capacity | 0.5 – 20 t/h |
| Design pressure | 1.0, 1.25, 1.6, 2.5 MPa |
| Saturated steam temperature | 184 – 226 °C |
| Efficiency | ≥ 96 % with economiser (gas) |
| NOx | ≤ 30 – 80 mg/m³ depending on burner |
| Fuel | Natural gas, LPG, diesel, heavy oil, dual fuel |
| Turndown | 5:1 |
Package scope
Pressure vessel, burner, feedwater pump set, water level controls, safety valves, pressure switch, control panel and economiser. Optional: deaerator, softener, blowdown heat recovery, and a skid-mounted steam header.
Efficiency in practice
The economiser recovers about 5–6 points; the rest depends on excess air and blowdown. Running at 3 % O₂ instead of 6 % is worth roughly one point of efficiency, and a 10 % blowdown rate on a 10 t/h boiler wastes more fuel than most operators realise.
FAQ
How long does installation take? Typically 5–10 days including steam piping connection and commissioning.
Can it meet 30 mg/m³ NOx? Yes, with a low-NOx burner and flue gas recirculation where the furnace volume allows.